A worked make-up-water saving from raising a cooling tower's cycles of concentration, priced at Dubai's (DEWA) commercial water tariff, set against the flow, conductivity and water-treatment checks a facility must run on its own meters before approving a higher target.
- Decision question
- Does raising a Dubai cooling tower's target cycles of concentration cut its make-up-water charge enough to justify the change, and what must be measured and confirmed with a water-treatment specialist before approving it?
- Audience
- Facilities and QHSE managers of commercial and industrial sites in Dubai operating water-cooled chillers with cooling towers, billed on DEWA's commercial water tariff
- Geography
- UAE
- Sector
- Commercial buildings, Facilities management, Cooling tower operations
- Theme
- Buildings & Cooling
- Series
- BARZ Operational Performance Briefs
Decision question and audience
A water-cooled chiller plant loses water from its cooling tower in three ways — evaporation, which does the actual cooling; blowdown, the deliberate discharge that keeps dissolved solids from fouling the system; and drift, a small mist loss. All three are replaced by purchased make-up water, metered and billed like any other water account. A facility can often push its cycles of concentration — how many times the make-up water's mineral load is allowed to concentrate in the recirculating water before it is discharged — well above where it is currently running, cutting the make-up water it buys without changing its cooling load at all. The facilities or QHSE manager deciding whether to approve that change needs two things this brief sets out: an illustrative read of what the water-charge saving is worth under Dubai's (DEWA) own commercial water tariff, and the flow, conductivity and water-chemistry checks that decide how far cycles of concentration can safely go on that site's own water — a site-specific, vendor-confirmed judgement, not a general number.
Executive summary
Raising a cooling tower's cycles of concentration from three to six cuts its make-up water by 20 % [1] and its blowdown by 50 % [1], per U.S. federal operations guidance for cooling towers; many systems run no higher than 4 x [1] cycles today, while 6 x [1] cycles or more is stated as achievable with active control. Applied to an illustrative facility's assumed annual make-up water volume and priced at Dubai's (DEWA) top commercial water-tariff slab, this brief's own 242,846 AED baseline make-up-water charge could fall by an illustrative 48,569 AED a year if that same facility could safely make the same move. Dubai's own green-building code, Al Sa'fat, already defines no data as a term for new-building compliance, so the metric itself is not foreign to a Dubai engineering team. But the ceiling any one tower can actually reach depends on its own make-up water quality and water-treatment programme, not a general number — the practical next steps below set out what to measure and ask a water-treatment vendor before approving a higher target.
Evidence and methodology
U.S. federal guidance for cooling tower operation and maintenance states the water balance as Make-Up = Evaporation + Blowdown + Drift [1], and defines cycles of concentration as approximately equal to the ratio of make-up to blowdown water volume (equivalently, the ratio of dissolved-solids concentration in the blowdown water to that in the make-up water). Raising that ratio means less water has to be discharged as blowdown — and therefore less has to be bought as make-up — for the same cooling load, within the limits the make-up water's own chemistry and the facility's water-treatment programme allow; dissolved solids concentrate faster at higher cycles and can cause scale or corrosion if not controlled. Dubai Municipality's own Al Sa'fat — Dubai Green Building System, Version 2.0, uses the same ratio, defining no data in its own Definitions section; Al Sa'fat applies to all new buildings in Dubai, with Silver Sa'fa classification mandatory and Golden or Platinum pursued additionally [3].
The illustrative scenario below assumes one facility's annual cooling-tower make-up water volume, held constant so only the cycles-of-concentration figure varies, and prices it at Dubai's (DEWA) Schedule 2 Commercial water tariff, over its top commercial slab [4] — the same tariff this desk has used for other Dubai water-charge work, excluding any separate sewerage, wastewater or fuel-surcharge component, which Schedule 2 does not itself state.
| Input | Value | Unit | Source or assumption |
|---|---|---|---|
| annual_makeup_m3 | 24,000 | m³ | assumption: illustrative annual cooling-tower make-up water volume for one commercial facility, chosen to stay above the 1,091.0616 m³/year threshold above which Dubai's top commercial water slab below applies — an order-of-magnitude scenario only, not a measurement of any specific tower |
| months_per_year | 12 | assumption: twelve equal monthly billing periods in a year, used only to convert the annual scenario into a monthly billed-account volume |
Formula: annual_makeup_m3 / months_per_year
Calculated result: 439,938 IG
- Unit conversion: 1 Imperial gallon = 0.00454609 cubic metres, so 2,000 m³ a month converts to about 439,939 Imperial gallons a month; the calculation applies this automatically from the stated unit.
- Dubai's Schedule (2) states its top commercial water slab applies above 20,000 Imperial gallons (about 90.9218 cubic metres) in a month; this scenario's own monthly volume stays well above that boundary, so the top-slab rate priced below applies to it throughout. A real account's own monthly meter reading decides its own slab.
- Assumes level monthly consumption; a real tower's own monthly make-up meter reading may vary with cooling load and ambient conditions.
| Input | Value | Unit | Source or assumption |
|---|---|---|---|
| annual_makeup_m3 | 24,000 | m³ | assumption: the same illustrative annual make-up water volume as the calculation above |
| tariff_dubai | 4.6 | fils/IG | 2011, Dubai (DEWA) [4] |
Formula: annual_makeup_m3 * tariff_dubai
Calculated result: 242,846 AED
- Illustrative make-up-water charge; not a measured site figure.
- Excludes any separate sewerage or wastewater charge, which Schedule (2) does not state, excludes VAT, and excludes DEWA's fuel surcharge under Article (2) of the same Resolution, which states no surcharge rate itself.
| Input | Value | Unit | Source or assumption |
|---|---|---|---|
| annual_makeup_m3 | 24,000 | m³ | assumption: the same illustrative annual make-up water volume as the calculations above |
| tariff_dubai | 4.6 | fils/IG | 2011, Dubai (DEWA) [4] |
| makeup_reduction_pct | 20 | % | 2026 [1] |
Formula: annual_makeup_m3 * tariff_dubai * (makeup_reduction_pct / 100)
Calculated result: 48,569 AED
- Illustrative water-charge saving; not a measured site figure. Assumes the facility's cooling load — and therefore its evaporation rate — is unchanged, so the same make-up volume at three cycles would otherwise have been bought.
- Uses a general U.S. federal relationship between cycles of concentration and make-up water volume, not a GCC-specific or site-specific measurement; a real site's own 12 months of make-up-meter readings, before and after the change, decide its own figure.
- Does not net off any change in water-treatment chemical or monitoring cost, which the source material states can run either way (Limitations) and for which no general GCC figure exists.
A facility cannot simply dial up its target cycles of concentration without first instrumenting and checking it. The same federal guidance sets out the operating checks: install flow meters on the make-up and blowdown lines and read them regularly; check the ratio of make-up flow to blowdown flow, and separately the ratio of blowdown conductivity to make-up conductivity (handheld conductivity meters can do this); both ratios should match the target cycles of concentration, and if they do not, check the tower for leaks or unauthorised draw-off before assuming the treatment programme is at fault; and keep a log of make-up and blowdown quantities, conductivity and cycles of concentration over time to catch any drift in performance [1].
Alternative options
Several measures reduce make-up water demand without, or alongside, raising cycles of concentration. A side-stream filtration system removes silt and suspended solids from the recirculating water, reducing fouling risk and supporting a higher sustained cycle. Acid treatment (sulfuric, hydrochloric or ascorbic) lowers the scale-forming potential of the recirculating water's alkalinity, allowing a higher cycle on the same make-up water quality, but needs trained staff, continuous pH monitoring and a timer-controlled dosing system, since an overdose can damage the system [1]. Installing a conductivity controller automates blowdown at a chosen set point rather than relying on manual valve operation, holding a higher cycle reliably once a safe target is confirmed. Alternate make-up water sources reduce the volume problem from a different angle: air-handler condensate has a low mineral content and is generated in the largest quantities exactly when cooling loads — and therefore make-up demand — are highest, making it a natural match for cooling-tower make-up; once-through cooling water, pretreated effluent and high-quality recycled water are other options where compatible with the tower's own chemistry [1]. A site that has not yet measured its own cycles of concentration has a reasonable case for doing that first, before committing to any one of these options.
Limitations and missing data
The federal guidance cited here describes cooling tower systems in general for U.S. federal facilities; it is not a UAE regulation and states no UAE, Oman or Saudi Arabia-specific measurement, and it gives no generic evaporation rate per ton of cooling or unit of heat rejected, so this brief cannot derive an absolute make-up water volume from a chiller plant's tonnage alone — the illustrative annual volume above is a stated order-of-magnitude assumption, not a measurement of any real tower. The stated 20 % [1] and 50 % [1] reductions assume the facility's cooling load, and therefore its evaporation rate, stays the same before and after the change; a real site's own make-up and blowdown meter readings decide its own figure. This brief prices only Dubai's (DEWA) Schedule 2 Commercial water tariff and does not price Abu Dhabi's or any other emirate's tariff. No GCC or site-independent figure exists for the net change in water-treatment chemical and monitoring cost from raising cycles of concentration — the cited guidance itself notes that savings on water can sometimes be outweighed by the cost of additional chemicals, or the reverse — so this brief does not calculate a payback or net benefit against that cost; a real decision needs the facility's own vendor quote. Dubai's tariff rests on a 2011 legal resolution; no later consolidating resolution confirming its continued currency was located, and both of this brief's calculated results (242,846 AED and 48,569 AED) depend on this rate still applying. Al Sa'fat Version 2.0 is cited here only for its Definitions-section entry for cycles of concentration; this desk has not independently read Al Sa'fat's separate article on water consumption for heat rejection and cooling towers and does not state what, if anything, it requires, and a reported later edition could not be confirmed at a stable, directly citable official URL during this check.
Practical next steps
First, if not already installed, fit flow meters on the make-up and blowdown lines and a conductivity meter (or an automatic conductivity controller) on the recirculating water — likely already required for a new Dubai building's own Al Sa'fat compliance records. Second, calculate the facility's own current cycles of concentration from its own meters, cross-checked between the make-up-to-blowdown flow ratio and the blowdown-to-make-up conductivity ratio, and start logging it alongside make-up and blowdown volumes. Third, ask the facility's water-treatment vendor in writing for the maximum cycles of concentration its own make-up water quality and treatment programme can sustain without scale or corrosion risk, and for its own quote covering any added chemicals, monitoring or equipment — such as an automatic conductivity controller or an acid-feed system — needed to run at that higher cycle. Fourth, weigh that vendor quote's net cost change against an illustrative water-charge saving recalculated on the site's own 12 months of make-up-water meter readings and its own confirmed DEWA billing category and slab, not the scenario in this brief. Only once both figures come from the site's own data should a higher target be approved — and logging should continue afterwards to confirm the target is actually being held, not just assumed.
Sources
- Best Management Practice #10: Cooling Tower Management — Federal Energy Management Program, U.S. Department of Energy
- Al Sa'fat — Dubai Green Building System, Version 2.0 — Dubai Municipality
- Al Sa'fat — Dubai Municipality
- Executive Council Resolution No. (16) of 2011 Approving the Electricity and Water Tariff in the Emirate of Dubai
BARZ